How Big League Clean cleaned the boiler, compressor, refrigeration and chemical storage rooms of a Denver distribution facility, ceilings first.
Free walkthrough. No obligation.
1NA Supply Chain runs a large distribution operation on Denver’s Tower Road corridor by Denver International Airport, a logistics pocket where freight moves fast and a facility has to be ready to work the day it opens. When construction wrapped on its roughly 100,000 sq ft building, the five mechanical rooms that keep it running still held everything the build left behind: the south and north boiler rooms, the compressor room, the refrigeration room and the chemical storage room. We came in for a one-time post-construction cleanup of those five rooms.
If you’ve walked a new building at turnover, you know what its mechanical rooms look like. At 1NA Supply Chain it was drywall dust, packaging, stickers and labels, overspray on the walls and debris on the floors, in the five rooms the whole facility depends on.
A general end-of-build sweep misses what matters in rooms like these. 1NA Supply Chain wanted a crew that would treat the final detail as seriously as the trades treated the build, and that’s the job we took on.
One cleanup, five rooms.
In every room, from the top down:
All construction debris, trash and leftover packaging.
Out of eye line and easy to miss, so they go first.
Dust, smudges, overspray and every sticker and label left on the surfaces.
Swept, mopped and scrubbed.
1NA Supply Chain’s mechanical core was handed over ready, not almost ready, with all five rooms clean from the overhead structures down to the floors.
If your next Denver build has boiler, compressor, refrigeration or chemical storage rooms that have to be ready before the equipment runs, we’ll walk them with you and scope them room by room. Turnover work like this, for the operations growing out by the airport and across the city, is what our post-construction cleaning in Denver is built for. Once the building is running, warehouse cleaning in Denver is the next step, and our commercial cleaning in Denver page covers the rest of what we do.
Yes. 1NA Supply Chain’s distribution facility on the Tower Road corridor is one of them, and we take on post-construction cleanups for builds across the Denver metro.
Yes. We work around your schedule, including early mornings, evenings, nights and weekends. Tell us the turnover date when you request the walkthrough and we’ll plan the cleanup around it.
We walk the space with you in person, see what the build left behind and what has to be ready at handover, then come back with a custom quote and a scope of work for your project.
Tell us about the building and when it turns over, and we’ll set up a free walkthrough with no obligation.